2-4
Rack-Mountable Server Installation
For use with Pentium II Xeon and Pentium III Xeon processor-based servers only
Writer: Sam Ogden Project: Compaq ProLiant 6500 Setup and Installation Guide Comments: 328196-002 (February 1999)
File Name: C-CH02.DOC Last Saved On: 3/17/99 10:18 AM
COMPAQ CONFIDENTIAL - NEED TO KNOW REQUIRED
Turn on the computer and insert the SmartStart and Support Software CD
to configure and manage the server. When the server boots from the
SmartStart program, it automatically starts the System Configuration
Utility.
Register your server.
For complete details on the SmartStart program, read the SmartStart installation
card included in your SmartStart package.
After the SmartStart program has finished configuring your system, you have
completed the installation of your new Compaq server.
Preparing the Server
Optimum Environment
When installing your ProLiant 6500 in a rack, certain temperature standards
and power requirements must be met.
Space Requirements
Consider the following items when deciding where to install your Compaq
rack:
Clearance in the front of the rack should be a minimum of 25 inches for
servicing.
Clearance in the back of the rack should be a minimum of 30 inches to
allow for servicing and for adequate airflow.