4-24 Compaq ProLiant DL580 Server Setup and Installation Guide
Compaq Confidential Need to Know Required
Writer: Cynthia Dresden Project: Compaq ProLiant DL580 Server Setup and Installation Guide Comments:
Part Number: 159213-003 File Name: e-ch4 Installing the Server.doc Last Saved On: 4/5/01 2:26 PM
Figure 4-14. Loading the server with handles into the rack
4. Attach the server to the slide rails with three screws on each side. Begin
with the back screw hole, and then adjust the inner slide rail and server
together to access the other screw holes through the slotted opening in
the inner slide.
5. Remove the handles from the server.
IMPORTANT: You may have to apply pressure when initially sliding the server into the
rack. However, after the first installation, the ball bearings in the slide will move easily.
6. Slide the server into the rack.
WARNING: To reduce the risk of personal injury, use caution when pressing the
server rail release latches and sliding the server into the rack. The slide rails can
pinch your fingertips.
7. Press the server rail release latch on either side of the server, and
continue to slide the server into the rack.
IMPORTANT: When servicing the server, fully extend the server until the latches lock. To
return the server to the rack, press the latches and slide the server into the rack.
8. Secure the server faceplate to the front of the rack by screwing the
thumbscrews into the cage nuts.
9. Tighten the thumbscrews before you close the rack door to prevent the
door from hitting protruding thumbscrews.
Vue de la page 93
1 2 ... 89 90 91 92 93 94 95 96 97 98 99 ... 221 222

Commentaires sur ces manuels

Pas de commentaire